Scheer SocialScheer SocialScheer SocialScheer Social
  • No Menu Set

I-696 Interchange Update

Bergmann and Associates

Wayne County, Michigan

Project Leaders

• Bergmann and Associates — Mike Isola, P.E.

• Consultant — Gilbert Barish, P.S.

Client: MDOT
Location: Wayne County, Michigan
Contracted By: Bergmann and Associates
Completed: March 2008
Responsibility: Sub Consultant

The project consisted of supplemental mapping throughout the Mound Road interchange from 20 feet from the existing edge of pavement to the right of way line. Mapping included utilities, tree location and identification, underclearance mapping of 16 structures, exit ramp mapping, merging of terrain models in Caice for the design consultant. Project included the retracement of existing horizontal and vertical control and densification of control along newly mapped portions of the project.

Would you like us to provide a land survey quote?

Yes, let’s talk!
  • _Dash: social calendar
  • _Form: social content
  • Contact
  • DADSDAY RUN CLUB for Family Connections
  • Home
  • OBC social dash
  • OhioTide
  • OhioTide (auction page)
  • OhioTide (super bowl square page)
  • OhioTide Colin
  • Principals
  • Projects
  • The Federal Metal Story
  • The Federal Metal Story 2
  • The Federal Metal Story-old
Scheer Social